Medium Voltage Unarmoured Cable: Selection, Applications, and Installation Requirements
Medium voltage unarmoured cable is used to carry power in installations where the cable’s route and surroundings provide adequate mechanical protection, or where protection is provided separately. It can be suitable for indoor electrical rooms, cable trays, ducts, and other controlled routes, subject to the project design and applicable electrical requirements. To select it, confirm the system voltage, conductor and insulation requirements, installation environment, fault conditions, and protection method before requesting a quotation. Unarmoured does not mean unprotected: the full cable route must be assessed for impact, crushing, moisture, and other foreseeable risks.
Please visit our website for more information on this topic.
Key Takeaways
- Choose cable voltage, insulation, conductor, and screen to match the electrical system and project specification.
- Use unarmoured construction only where the route offers suitable mechanical protection or separate protection is designed.
- Confirm installation, termination, testing, and handling requirements with the cable supplier and project engineer before procurement.
- Provide Zhongdong Cable Co., Ltd. with the project’s technical requirements and delivery needs to support a more accurate product discussion and quotation.
Who This Guide Is For
This guide is intended for electrical contractors, engineering teams, distributors, and procurement professionals comparing medium voltage cable options. It is especially relevant when a project specifies an unarmoured cable but does not yet define all construction details. We recommend using this information as a planning aid, not as a substitute for the governing project specification, local electrical regulations, or engineering approval. Final selection should be verified against the actual route and operating conditions.
What Is Medium Voltage Unarmoured Cable?
Basic construction and function
A medium voltage cable transfers electrical power at a voltage level defined by the relevant system and project standards. Its construction commonly includes a conductor, insulation, semiconductive layers where required by the design, a metallic screen, and an outer sheath. “Unarmoured” means it does not include a dedicated metallic armour layer intended to provide mechanical protection. The precise layer arrangement depends on the voltage class, cable standard, and purchaser’s specification.
For example, project specifications may use voltage designations such as 6/10 (12) kV or 8.7/15 (17.5) kV. These examples are not a complete list of available ratings, and notation and requirements should be checked against the applicable standard. The selected cable must be compatible with the system’s maximum voltage, earthing arrangement, and expected operating conditions. Do not select by nominal voltage alone.
Common materials and construction options
Conductors are commonly specified in copper or aluminium, with the choice influenced by electrical design, weight, installation conditions, and budget. XLPE is a common insulation option for medium voltage power cables; other insulation systems may be required by particular applications or specifications. The outer sheath material and colour should be selected according to the environment and project requirements rather than assumed from the voltage rating. Always request a complete construction description when comparing quotations.
Where Unarmoured Cable May Be Suitable
Unarmoured cable may be considered for protected indoor routes, cable trays, ducts, or electrical rooms where the design limits exposure to mechanical damage. It may also suit projects where a separate conduit, enclosure, or other engineered measure provides the required protection. In utility, industrial, commercial, and infrastructure projects, suitability depends on the installation route and local rules, not simply on the industry sector. The design team should assess the complete cable path, including transitions and accessible areas.
Unarmoured construction may be a poor fit where a cable is exposed to likely impact, crushing, excavation damage, or other mechanical hazards and no separate protective measure is specified. Outdoor use is not automatically ruled out, but the sheath, water exposure, UV exposure, temperature range, and support system must be considered. A route that begins in a protected duct may become exposed near equipment or at a building entry. These transitions are important to review before finalizing the cable design.
How to Select the Right Cable
1. Confirm the electrical system requirements
Start with the system voltage, frequency, fault level, earthing method, and the required cable rating. Common power systems operate at either 50 Hz or 60 Hz, so identify the project frequency rather than assuming it. Confirm the required number of cores and whether the design calls for a metallic screen, conductor screen, or other specified layers. Ask the project engineer to clarify any conflict between a single-line diagram, cable schedule, and technical specification.
Zhongdong Cable Co., Ltd. are exported all over the world and different industries with quality first. Our belief is to provide our customers with more and better high value-added products. Let's create a better future together.
2. Specify conductor and insulation
Conductor material and cross-sectional area should be based on the electrical load, installation method, ambient conditions, voltage drop, and short-circuit requirements. A larger conductor is not automatically the best choice because the final design also depends on termination compatibility, route constraints, and project economics. For XLPE-insulated designs, a 90°C maximum normal conductor operating temperature is commonly specified, but the permitted value depends on the applicable cable standard and installation conditions. Confirm the rating and any emergency or short-circuit limits in the supplier’s technical data.
3. Check the route and protection method
Map the route and identify whether the cable will be installed in a tray, duct, conduit, tunnel, or another arrangement. Review bending space, pulling access, support spacing, moisture exposure, and points where the cable could be struck or crushed. If the route does not provide adequate mechanical protection, consider armour or a separately engineered protective system. Make sure the protection remains continuous at joints, entries, and equipment connections.
4. Define screens, sheath, and accessories
Specify metallic screen material and cross-section according to the grounding and fault-current design. The sheath should suit the installation environment and any project requirements for moisture, chemicals, sunlight, or flame performance. Confirm compatible terminations and joints for the cable’s conductor size, insulation, screen, and voltage class. Accessories should be considered during cable selection, since an otherwise suitable cable may not match the available termination system.
Installation Requirements and Common Mistakes
Installation should follow the approved method statement, cable manufacturer’s instructions, and applicable regulations. Use suitable rollers and pulling equipment, avoid exceeding the stated pulling tension, and observe the manufacturer’s minimum bending radius. There is no single bend-radius value that is safe for every medium voltage cable; the required value depends on cable construction and whether the cable is being pulled or positioned. Keep the cable and accessories clean and dry during handling, storage, and termination.
A frequent mistake is treating “unarmoured” as a simple cost-saving substitution without checking mechanical exposure. Another is ordering by voltage and conductor size alone while leaving out screen, sheath, test, and accessory requirements. Buyers should also avoid assuming that the same installation limits apply across different cable constructions. Request a project-specific datasheet and confirm any unclear details in writing before production or dispatch.
Pricing, MOQ, and Lead-Time Considerations
Pricing depends on factors such as conductor material and size, voltage class, insulation and sheath materials, screen construction, order quantity, and packaging or delivery requirements. Minimum order quantities and lead times vary with the requested specification, production schedule, and destination. We recommend sending a complete cable schedule rather than requesting a price using only a general product name. This gives the supplier a better basis for identifying assumptions and clarifying exclusions.
Supplier Evaluation Checklist
- Can the supplier review the required voltage designation, standard, and cable construction?
- Does the quotation state conductor material and size, insulation, screen, sheath, and core configuration?
- Are applicable routine tests, documentation, packaging, and inspection requirements clearly identified?
- Can the supplier discuss accessories, installation constraints, order quantity, delivery destination, and expected schedule?
- Are deviations or open technical points listed clearly for approval before order confirmation?
Conclusion: Make the Route and Specification the Starting Point
Medium voltage unarmoured cable is an appropriate choice when its electrical construction matches the system and the installation provides adequate mechanical protection. The next step is to confirm voltage, conductor, insulation, screen, sheath, accessories, and route conditions with the project engineer. Then compare supplier quotations using the same written specification, including testing, packaging, quantity, and delivery requirements. This approach reduces avoidable ambiguity before procurement and installation.
At Zhongdong Cable Co., Ltd., we can discuss your medium voltage cable requirements and review the information needed to prepare a relevant product proposal. Send us the voltage designation, applicable standard, cable schedule, installation environment, order quantity, and destination. If some details are not yet finalized, identify them as pending so we can help clarify the points to resolve before quotation and order confirmation.